BELANJA PEGAWAI
Rp.
852,676,000
22 Item
BELANJA BARANG DAN JASA
Rp.
3,884,180,350
163 Item
BELANJA MODAL
Rp. 1,141,526,600
8 Item
Komposisi Anggaran
PENYEDIA
Rp. 2,498,043,150
110 Item
SWAKELOLA
Rp. 3,380,339,800
83 Item
Total Anggaran
Rp. 5,878,382,950
Prioritas
Non Prioritas | 100.00 % | 5,878,382,950 193 Item |
Lokasi
Kabupaten Bone Bolango |
100.00 % |
5,878,382,950 193 Item |
Sumber Dana
Dana Alokasi Umum |
100.00 % |
5,878,382,950 193 Item |
Kategori Belanja
Belanja Pendukung | 94.59 % | 5,560,463,950 185 Item |
Belanja Utama | 5.41 % | 317,919,000 8 Item |
Jenis Pengadaan
Jasa Lainnya | 63.13 % | 3,710,923,800 106 Item |
Barang | 24.76 % | 1,455,405,500 85 Item |
Konstruksi | 11.77 % | 692,053,650 1 Item |
Konsultansi | 0.34 % | 20,000,000 1 Item |
Metode Pengadaan
Swakelola 1 | 57.51 % | 3,380,455,800 91 Item |
Pengadaan Langsung | 24.25 % | 1,425,473,500 99 Item |
Tender | 11.77 % | 692,053,650 1 Item |
e-Purchasing | 6.47 % | 380,400,000 2 Item |