BELANJA PEGAWAI
Rp.
294,300,000
6 Item
BELANJA BARANG DAN JASA
Rp.
1,581,200,000
54 Item
BELANJA MODAL
Komposisi Anggaran
PENYEDIA
Rp. 759,420,000
31 Item
SWAKELOLA
Rp. 1,116,080,000
29 Item
Total Anggaran
Rp. 1,875,500,000
Prioritas
Non Prioritas | 100.00 % | 1,875,500,000 60 Item |
Lokasi
Kabupaten Bone Bolango |
100.00 % |
1,875,500,000 60 Item |
Sumber Dana
Dana Alokasi Umum |
100.00 % |
1,875,500,000 60 Item |
Kategori Belanja
Belanja Pendukung | 58.14 % | 1,090,450,000 48 Item |
Belanja Utama | 41.86 % | 785,050,000 12 Item |
Jenis Pengadaan
Jasa Lainnya | 93.81 % | 1,759,315,000 35 Item |
Barang | 6.19 % | 116,185,000 25 Item |
Metode Pengadaan
Swakelola 1 | 59.84 % | 1,122,275,000 30 Item |
Pengadaan Langsung | 39.98 % | 749,845,000 28 Item |
Swakelola 2 | 0.18 % | 3,380,000 2 Item |