BELANJA PEGAWAI
Rp.
169,170,000
6 Item
BELANJA BARANG DAN JASA
Rp.
357,724,000
63 Item
BELANJA MODAL
Rp. 266,037,500
3 Item
Komposisi Anggaran
PENYEDIA
Rp. 418,094,500
52 Item
SWAKELOLA
Rp. 374,837,000
20 Item
Total Anggaran
Rp. 792,931,500
Prioritas
Non Prioritas | 100.00 % | 792,931,500 72 Item |
Lokasi
Kecamatan Botupingge |
100.00 % |
792,931,500 72 Item |
Sumber Dana
Dana Alokasi Umum |
100.00 % |
792,931,500 72 Item |
Kategori Belanja
Belanja Pendukung | 80.19 % | 635,816,500 27 Item |
Belanja Utama | 19.81 % | 157,115,000 45 Item |
Jenis Pengadaan
Jasa Lainnya | 49.54 % | 392,819,000 48 Item |
Barang | 35.54 % | 281,800,000 20 Item |
Konsultansi | 11.01 % | 87,275,000 3 Item |
Konstruksi | 3.91 % | 31,037,500 1 Item |
Metode Pengadaan
Swakelola 1 | 47.21 % | 374,337,000 19 Item |
e-Purchasing | 29.01 % | 230,000,000 1 Item |
Pengadaan Langsung | 23.78 % | 188,594,500 52 Item |